Capital Project Equipment Strategy

What If Your Biggest Cost Reduction Opportunity Is Already On Your Project?

Equipment can represent 15–25% of your total project cost on heavy civil and capital projects. Most owners treat it as a fixed cost. It isn't.

Hypothetical $150M Project

$8M

in recoverable cost on a single capital project

Based on industry utilization benchmarks and typical markup structures. Equipment at 25% of total project cost.

How Equip U Changes the Math

01

One Partner for Everything

Sourcing, support, and accountability — under one roof. No more finger-pointing between vendors when things go wrong on site.

02

85–90% Fleet Utilization

When each sub sources their own fleet, utilization runs 50% or less. A shared, coordinated fleet changes that math immediately.

03

No Markup Stacking

Sub and GC markup layers — typically 10–25% each — eliminated. One source, transparent pricing, from project inception.

Let's talk about your next project.

The best time to bring Equip U to the table is before the equipment plan is set — not after the project is already in motion.

Get in Touch